GALLERY | CONTACT | SITEMAP
PROJECT TEAM IN PHOTOGRAPH

STEEL STRUCTURE & CIVIL WORK
Project team Experiences in civil and Steel Structure work for Tanjung Jati B Steam Power Plant Project
 
 
 
MAINTENANCES WORK FOR INDUSTRIAL PLANT SERVICES
BOLT TENSIONING WORK
 
 
 
Hydraulic bolt tensioning is the most consistent of applying accurate pre-load to bolts. Bolt tensioning is an accurate and time saving method for tightening bolts and studs in all industries. Controlled bolt tensioning to calculated values to eliminate flange leakage. Versatile compact design ensure maximum economy over any given size range
HYDRAULIC TORQUE WRENCH
Comprehensive range of hydraulic torque wrench equipment for tightening and loosening bolts. We have been experience and solution to any industrial bolting problem, Hydraulic torque wrench ideal for break-out and make-up of bolted joints, with output torque capacity up to 45,000 lbf.ft
 
 
 
IN SITU FLANGE MACHINING
Precision portable machine tools for multi-positional on-site machining operations without dismantling. On-site flange machining from 0 – 120”, flange face inspection and alignment control prior to ensure correct face finish and no external bending movements. Lightweight, portable, flange facing, grooving and weld preparation machine designed to machine full faced, raised face and grooved flanges
 
 
 
COLD CUTTING & BEVELLING
Portable pipe cutting machines designed for on-site precision severing, severing/bevelling and severing/double bevelling. Our pipe cutting machine operated by our high experience technician
 
 
 
HOT TAPPING
Hot Tapping or pressure tapping is the method of making a connection to existing piping or vessels while that existing system is under pressure. This method employs a drilling or tapping machine, a full-ported valve and a pressure-containing attached to the existing pressurized system. Connection to existing pipe is made through a full encirclement split tee, designed to contain system pressure and provide connector outlet. The drilling machine generally consists of a telescoping boring bar, mechanically driven, which advances a cutting tool. Usually a necessary element in the hot tap connection is the full-ported valve, which can become a control valve for the new connection, and allow the drilling machine to be removed after the cutting operation. Gate valves and other full-ported valves with flanged and screwed connection typically include 150# through 900# ANSI rating
 
 
 
STATIC EQUIPMENT & BOILER ERECTION WORK
Project team experiences of Static Equipment and Boiler erection work at PT. Kaltim Daya Mandiri, Bontang – East Kalimantan
 
 
 
MECHANICAL WORK
Project team experiences of Turbine & Boiler erection work for Ombilin Steam Power Plant 2 x 100 MW
 
 
 
MECHANICAL WORK
Project team experiences of Turbine & Boiler erection work for Tambak Lorok Combine Cycle Power Plant
 
 
 
Erection Conveyor for Coal Handling System Paiton Private Power Plant Unit # 7 & 8
Project team experiences for erection conveyor for Coal Handling System of Paiton Private Power Plant unit # 7 & 8
 
 
 
TANK ERECTION WORK
Project team experiences for Tank erection work of Ammonia plant PT. Kaltim Parna Industri project, Bontang